Beijing Pepsi

Scaling in the lithium bromide chiller's cooling water system is reducing summer cooling capacity.

Beijing Pepsi Refrigeration Unit On-Site

Issue

Situation before processing

Scaling in the condenser of the lithium bromide chiller at the beverage plant causes reduced cooling capacity during peak summer temperatures.

Instructions

Installation Location & Plan

Install equipment on the main cooling water circulation line to reduce condenser scaling and biofouling.

Acceptance and Operational Performance

Stable cooling capacity restored, condensing temperature reduced, and chemical treatment and cleaning costs lowered.

Note: Project outcomes depend on water quality, operating conditions, and management practices. This case study illustrates the approach for similar systems only and does not constitute a guarantee of results for specific projects.