Skip to main content

Gansu Ferroalloys

Scaling in the waste heat power generation condenser reduces vacuum levels and affects power output.

Gansu Ferroalloy: Waste Heat Power Generation Site

Issue

Situation before processing

Fouling on the circulating water side of the waste heat power generation condenser reduces vacuum levels, impacting turbine output and power generation.

Instructions

Installation Location & Plan

Install equipment on the circulating water supply header, with priority protection of the condenser heat exchanger tube bundle.

Acceptance and Operational Performance

Vacuum level rises and stabilizes, power generation recovers, and condenser cleaning intervals are extended.

Note: Project outcomes depend on water quality, operating conditions, and management practices. This case study illustrates the approach for similar systems only and does not constitute a guarantee of results for specific projects.

Luan ICP Bei 19043462 Hao - 3