Sinopharm Group Chlor-Alkali Plant

Scaling in the primary fractionation tower's circulating water system and heat exchangers causes frequent cleaning, disrupting continuous production.

Sinochem Group Chlor-Alkali Plant - Heat Exchanger Site

Issue

Situation before processing

Scaling in the chlor-alkali unit's primary fractionation column and associated heat exchangers has reduced heat transfer efficiency. The cleaning window conflicts with the production schedule.

Instructions

Installation Location & Plan

Install equipment on the plant's circulating water main, prioritizing protection of the initial fractionation tower condenser and heat exchange branches.

Acceptance and Operational Performance

The temperature difference at the heat exchanger end stabilizes, extending cleaning cycles and increasing continuous operation time.

Note: Project outcomes depend on water quality, operating conditions, and management practices. This case study illustrates the approach for similar systems only and does not constitute a guarantee of results for specific projects.