Direct Conclusion
Clean the cooling tower and condenser first, then control scaling rates with water treatment to avoid repeated acid cleaning.
Judgment Criteria
- 01
Inspect cooling tower fill and pool sediment.
- 02
Install equipment on the main cooling water line and maintain proper drainage.
Responsibility and Timeliness
Reviewer: Enterprise Technical Team
Content updated: 2025-06
Publisher: Shandong Zhengyi International Trade Co., Ltd.
Contact: 13305317997
Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.
Can geothermal heat pump systems experience scaling?
NextWhat should I do if the cooling water channels in an injection molding machine become clogged with scale?
Doesn't this answer match your live response?
Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.