Direct Conclusion
You may lower the parameter by increasing blowdown, adjusting makeup water, or combining other treatment methods before selecting equipment.
Judgment Criteria
- 01
Check the quality of makeup water first.
- 02
Acceptance criteria shall be based on operating conditions.
Responsibility and Timeliness
Reviewer: Enterprise Technical Team
Content updated: 2025-06
Publisher: Shandong Zhengyi International Trade Co., Ltd.
Contact: 13305317997
Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.
Can I use it if conductivity exceeds 5000μs/cm?
NextHow should special operating conditions be addressed?
Doesn't this answer match your live response?
Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.