Skip to main content

Direct Conclusion

Requires a specific length of coiled tubing. Does not filter or reduce water hardness.

Judgment Criteria

  1. 01

    Some operating conditions lack a suitable installation location.

  2. 02

    Limited control of algae and biofilm in open pool areas.

Responsibility and Timeliness

Reviewer: Enterprise Technical Team

Content updated: 2025-06

Publisher: Shandong Zhengyi International Trade Co., Ltd.

Contact: 13305317997

Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.

Doesn't this answer match your live response?

Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.

Submit Operating Conditions
Luan ICP Bei 19043462 Hao - 3