Direct Conclusion
Prioritize backwashing and recirculation cleaning without disassembling the plates. In severe cases, disassemble for cleaning and inspect the gaskets.
Judgment Criteria
- 01
Confirm plate material compatibility with the cleaning agent before starting.
- 02
Record the post-cleaning pressure drop as the baseline for subsequent measurements.
Responsibility and Timeliness
Reviewer: Enterprise Technical Team
Content updated: 2025-06
Publisher: Shandong Zhengyi International Trade Co., Ltd.
Contact: 13305317997
Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.
How to prevent scaling in cooling tower circulating water systems?
NextHow to handle fouling in shell-and-tube heat exchangers?
Doesn't this answer match your live response?
Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.