Direct Conclusion
The device will automatically resume operation after power is restored. We recommend verifying the control cabinet status.
Judgment Criteria
- 01
Short power outages do not affect performance.
- 02
Long-term shutdown must follow the shutdown procedure.
Responsibility and Timeliness
Reviewer: Enterprise Technical Team
Content updated: 2025-06
Publisher: Shandong Zhengyi International Trade Co., Ltd.
Contact: 13305317997
Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.
Doesn't this answer match your live response?
Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.