NEWS · News Center
Project Progress and Industry Insights
Company News, On-site Debugging Logs, Policy & Industry Updates. Actual project results are subject to installation and acceptance records; no performance guarantees are made.

FAQ
What to do when a heat exchanger is fouled? First, check these three things.
Determine whether the deposit is hard scale, slime, or corrosion product to decide on cleaning methods and whether to adjust the water treatment program.
Read full article
FAQ
How to verify physical descaling? How should photo and data comparisons be conducted?
Define the pre-installation location, cycle, and criteria to ensure comparable acceptance.

FAQ
How long of a conduit section is needed for DN00 piping?
The length of the tubing segment depends on the tube diameter and the number of coil groups, typically requiring at least 20 times the tube diameter.
View complete acceptance records for a project?
Installation and inspection records for similar projects are available upon request.