Skip to main content

Huaqin Group Pirelli Tires

Scaling in utility circulating water systems has reduced the efficiency of multiple heat exchangers.

Huaqin Group Pirelli Tire Heat Exchanger Site

Issue

Situation before processing

Scaling in the utility circulating water system of a tire factory has reduced efficiency across multiple heat exchangers and concentrated maintenance demands.

Instructions

Installation Location & Plan

Install equipment on the shared utility circulating water header to centrally treat cooling water for the entire plant.

Acceptance and Operational Performance

Multiple heat exchanger systems maintain stable terminal temperature differences, reducing maintenance workload and chemical consumption.

Note: Project outcomes depend on water quality, operating conditions, and management practices. This case study illustrates the approach for similar systems only and does not constitute a guarantee of results for specific projects.

Luan ICP Bei 19043462 Hao - 3