Ford Motor Company (Europe)
Applied in European factories since 1993, with long-term operational validation of the physical water treatment approach.

Issue
Situation before processing
European vehicle assembly plants face scaling issues in paint shop and powertrain cooling water systems, with complex chemical treatment management.
Instructions
Installation Location & Plan
Applied Dewehan frequency-variable resonance water treatment equipment in the factory's circulating cooling water system since 1993.
Acceptance and Operational Performance
The circulating water system remains stable after long-term operation, accumulating field data for future technical iterations.
Note: Project outcomes depend on water quality, operating conditions, and management practices. This case study illustrates the approach for similar systems only and does not constitute a guarantee of results for specific projects.

