CASES · Customer Success Stories
Actual installation location in the peer system
Filter by industry and application system to view each project's processed objects, installation locations, and acceptance comparison methods. Case results vary by operating conditions and are provided for reference only within similar systems.
Together2A case
Cement and FertilizerShanxi Zhihai Cement
Cooling Tower
Limescale buildup in the wind turbine gearbox cooling water leads to elevated oil temperatures and increased risk of shutdown.
View case details
Automotive ManufacturingFord Motor Company (Europe)
Cooling Tower
Applied in European factories since 1993, with long-term operational validation of the physical water treatment approach.
View case detailsTrust Endorsement
Some long-term customers
Client names are sourced from public case studies; specific projects can be scheduled for site visits.
Similar Projects
Want to see installation sites in your industry?
Available for assignment to view piping layout and operation records in commissioned projects.