Skip to main content

Direct Conclusion

Check if the coil is properly seated and undamaged, verify that ties are secure, and inspect connectors for oxidation.

Judgment Criteria

  1. 01

    Synchronize inspection during maintenance shutdown.

  2. 02

    Handle issues according to the standard procedure.

Responsibility and Timeliness

Reviewer: Enterprise Technical Team

Content updated: 2025-06

Publisher: Shandong Zhengyi International Trade Co., Ltd.

Contact: 13305317997

Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.

Doesn't this answer match your live response?

Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.

Submit Operating Conditions
Luan ICP Bei 19043462 Hao - 3