Direct Conclusion
Primary function: prevent scale buildup while gradually removing existing deposits. New scale inhibition is observable once the equipment is powered on and running. The gradual removal of old deposits typically becomes apparent within 2–3 months, depending on water flow velocity and deposit thickness.
Judgment Criteria
- 01
Acceptance testing allows comparison of operational data including temperature difference between heat exchanger inlet and outlet, medium cooling performance, flow rate and pressure, and pump power consumption.
- 02
Synchronize water quality stability, blowdown concentration ratio, and coupon comparison data for side-by-side analysis.
- 03
Take photos and archive data before installation; review monthly per the agreed schedule to prevent misjudgment from single-point readings.
Applicable Conditions
Acceptance criteria and cycle must be agreed upon in writing prior to installation; any significant changes in load or water replenishment should be communicated promptly.
Responsibility and Timeliness
Reviewer: Enterprise Technical Team
Content updated: 2025-06
Publisher: Shandong Zhengyi International Trade Co., Ltd.
Contact: 13305317997
Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.
Will carbon steel or stainless steel pipes shield the magnetic field, rendering the installation ineffective?
NextAfter installation, can all medications be discontinued?
Doesn't this answer match your live response?
Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.