Skip to main content

Direct Conclusion

First, verify the installation location, operational status, and process changes; then adjust the plan or add measures as stipulated in the contract.

Judgment Criteria

  1. 01

    Verify that the device is running continuously.

  2. 02

    Verify if operating conditions exceed the selection criteria.

Responsibility and Timeliness

Reviewer: Enterprise Technical Team

Content updated: 2025-06

Publisher: Shandong Zhengyi International Trade Co., Ltd.

Contact: 13305317997

Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.

Doesn't this answer match your live response?

Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.

Submit Operating Conditions
Luan ICP Bei 19043462 Hao - 3