Direct Conclusion
Suitable for circulating water systems including cooling towers, heat exchangers, refrigeration condensers, and air compressor coolers. Pre-assessment is required for wastewater with high hardness combined with high silica, high oil content, or excessive suspended solids.
Judgment Criteria
- 01
The standard system performs matching based on three conditions: pipe diameter, flow rate, and water temperature.
- 02
For conditions with high silica, high oil content, or high suspended solids, conduct water quality analysis first to determine suitability and acceptance criteria.
- 03
For systems where heavy sludge has clogged the pipes, we recommend performing a cleaning pretreatment before installing the equipment.
Applicable Conditions
Standard commitments do not apply to non-standard use cases; alternative solutions can be suggested.
Responsibility and Timeliness
Reviewer: Enterprise Technical Team
Content updated: 2025-06
Publisher: Shandong Zhengyi International Trade Co., Ltd.
Contact: 13305317997
Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.
Does the device consume a lot of power? Are there ongoing consumables? Is maintenance complicated?
NextWhat are the advantages and disadvantages compared to chemical dosing?
Doesn't this answer match your live response?
Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.