Preferred locations are immediately downstream of the primary circulation pump header, or at the first branch upstream of the heat exchanger and condenser.

Judgment Criteria

  1. 01

    Global Manager overrides the entire system.

  2. 02

    Prioritize protecting the heat exchange surface near critical equipment.