Direct Conclusion
Preferred locations are immediately downstream of the primary circulation pump header, or at the first branch upstream of the heat exchanger and condenser.
Judgment Criteria
- 01
Global Manager overrides the entire system.
- 02
Prioritize protecting the heat exchange surface near critical equipment.
Responsibility and Timeliness
Reviewer: Enterprise Technical Team
Content updated: 2025-06
Publisher: Shandong Zhengyi International Trade Co., Ltd.
Contact: 13305317997
Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.
Can one device support multiple systems?
NextAre there specific requirements for coil winding positions?
Doesn't this answer match your live response?
Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.