Direct Conclusion
Trench excavation and waterproof trough construction are required; coils must not be buried directly.
Judgment Criteria
- 01
Trench dimensions are determined by the coil group and maintenance clearance.
- 02
Ensure proper drainage and waterproofing.
Responsibility and Timeliness
Reviewer: Enterprise Technical Team
Content updated: 2025-06
Publisher: Shandong Zhengyi International Trade Co., Ltd.
Contact: 13305317997
Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.
Do you need to treat rust and anti-corrosion paint?
NextHow do I waterproof underground installations?
Doesn't this answer match your live response?
Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.