Skip to main content

How to install underground pipelines?

Direct Conclusion

Trench excavation and waterproof trough construction are required; coils must not be buried directly.

Judgment Criteria

  1. 01

    Trench dimensions are determined by the coil group and maintenance clearance.

  2. 02

    Ensure proper drainage and waterproofing.

Responsibility and Timeliness

Reviewer: Enterprise Technical Team

Content updated: 2025-06

Publisher: Shandong Zhengyi International Trade Co., Ltd.

Contact: 13305317997

Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.

Doesn't this answer match your live response?

Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.

Submit Operating Conditions
鲁ICP备19043462号-3