Direct Conclusion
Required. The insulation must be removed at the winding location to ensure the coil is close to the pipe wall.
Judgment Criteria
- 01
Cut length shall be determined based on the coil group arrangement.
- 02
Restore insulation after construction.
Responsibility and Timeliness
Reviewer: Enterprise Technical Team
Content updated: 2025-06
Publisher: Shandong Zhengyi International Trade Co., Ltd.
Contact: 13305317997
Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.