Skip to main content

Does the insulation layer need to be removed?

Direct Conclusion

Required. The insulation must be removed at the winding location to ensure the coil is close to the pipe wall.

Judgment Criteria

  1. 01

    Cut length shall be determined based on the coil group arrangement.

  2. 02

    Restore insulation after construction.

Responsibility and Timeliness

Reviewer: Enterprise Technical Team

Content updated: 2025-06

Publisher: Shandong Zhengyi International Trade Co., Ltd.

Contact: 13305317997

Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.

Doesn't this answer match your live response?

Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.

Submit Operating Conditions
鲁ICP备19043462号-3