Direct Conclusion
The coil is wound around the exterior of the pipe, requiring no cutting or hot work. Standard retrofitting can be performed without shutting down production; brief power outages are only needed during wiring and commissioning.
Judgment Criteria
- 01
The host can be placed in an explosion-proof enclosure; only a single 22V power line needs to be routed to the site.
- 02
Fits DN60 to DN600. For larger diameters, use branch installation or request a custom solution.
- 03
Before starting, confirm the insulation layer, surface condition, and working space of the pipe section to be wrapped.
Applicable Conditions
Configure the control cabinet according to the on-site explosion-proof rating. Wiring must be performed by a certified electrician.
Responsibility and Timeliness
Reviewer: Enterprise Technical Team
Content updated: 2025-06
Publisher: Shandong Zhengyi International Trade Co., Ltd.
Contact: 13305317997
Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.
After installation, can all medications be discontinued?
NextDoes the device consume a lot of power? Are there ongoing consumables? Is maintenance complicated?
Doesn't this answer match your live response?
Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.