Direct Conclusion
Grounding and lightning protection must comply with on-site electrical codes.
Judgment Criteria
- 01
Ensure the control cabinet is reliably grounded.
- 02
Outdoor cable conduit installation.
Responsibility and Timeliness
Reviewer: Enterprise Technical Team
Content updated: 2025-06
Publisher: Shandong Zhengyi International Trade Co., Ltd.
Contact: 13305317997
Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.
Doesn't this answer match your live response?
Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.