Direct Conclusion
Yes. The host and control cabinet can be reused; the coil is reconfigured for the new pipe diameter.
Judgment Criteria
- 01
Re-evaluate selection after relocation.
- 02
Coils are generally reinstalled on-site as new.
Responsibility and Timeliness
Reviewer: Enterprise Technical Team
Content updated: 2025-06
Publisher: Shandong Zhengyi International Trade Co., Ltd.
Contact: 13305317997
Content is compiled based on product technical documentation and field experience. Actual operating conditions are subject to site confirmation and contractual agreements.
Do lightning-prone areas require lightning protection?
NextHow long is the acceptance period?
Doesn't this answer match your live response?
Provide pipe diameter, flow rate, and water temperature for technical assessment based on operating conditions.